Safety Barrier Solutions - HSEQ Induction


Description


Safety Barrier Solutions - HSEQ Induction is designed to provide essential training and information on Health, Safety, Environment, and Quality (HSEQ) practices. This induction will cover the importance of maintaining a safe working environment, the identification of potential hazards, and the implementation of effective safety measures. Participants will learn about compliance with industry standards, the significance of personal protective equipment, and the procedures for reporting incidents. The goal is to ensure that all employees are equipped with the knowledge and skills necessary to promote a culture of safety and to minimize risks in the workplace.
Content
  • SBS National Operations
  • Company Introduction
  • HSEQ Responsibilities
  • Legislation
  • Consultation
  • Hazards & Risks
  • Analysing Risk
  • Control Measures
  • Hazard, Incident & Near Miss Reporting
  • Risk Management
  • POLICY 020 - Non - Negotiables v3.docx
  • Additional SBS Mandatory Minimum Requirements
  • Tools & Equipment
  • Tag Out Procedure
  • PPE
  • HSEQ Responsibilities Assessment
  • Site Requirements
  • Traffic Management
  • Excavations
  • EF049 Job Sheet / ITP / GPP
  • Electrical hazard awareness for urban workers
  • Electrical Hazard Assessment
  • Avoiding Utilities Strikes 
  • DBYD Training
  • DBYD & Excavation Permit Assessment 
  • Basic Tool Safety & Awareness
  • Hand Tool Safety 
  • Hand Tools Procedure 
  • Basic Tool Safety Assessment
  • PPE Policy -006 
  • SBS PPE Policy Assessment
  • Manual Handling
  • Legal Framework (clone)
  • Manual Handling Techniques
  • Example of Safe Lifting Techniques (clone)
  • What is Manual Handling? (clone)
  • Manual Handling Techniques (clone)
  • Manual Handling Technique Assessment
  • Manual Handling Risk Assessment 
  • Implementing Solutions 
  • Alter the Workplace 
  • Alter Environmental Conditions 
  • Alter Systems of Work 
  • Modify & Use of Objects 
  • Manual Handling Assessment 
  • Plant Clearance and Red Zone
  • Working Around Mobile Plant 
  • Plant Safety Assessment
  • Post Rammers
  • Red Zone Work Instruction
  • Red Zone Assessment
  • Fit For Work
  • Drug & Alcohol Statement
  • Drugs and the Workplace 
  • Drugs & Alcohol Policy-005 
  • Drugs & Alcohol in the Workplace 
  • How Addiction Affects The Brain
  • EEO, Discrimination, Bullying & Harassment Policy
  • Environmental Protection
  • Environmental legislation
  • Environmental Impacts & Aspects (Water)
  • Environmental Impacts & Aspects (Other)
  • Guardrail Installation
  • Review & Awareness of Work Instruction WI-005 
  • Marking the offset from the edge line for guardrail alignment & installation 
  • Running the tape out along the marked offset points 
  • Marking out the terminal post locations off the tape laid out 
  • Marking out the post spacings using the mark-out board 
  • Laying out posts off the truck ready for installation 
  • Setting up the crane to unload the terminal from the truck to position 
  • Operation of the crane 
  • Performing a crane lift (A spotter is required and clear zone implemented) (clone)
  • Unloading the post rammer (Orteco)
  • Unloading plant safely as per SBS Red Zone (10m clear in direction of travel) 
  • Terminal posts are being installed as per the manufacturer's specifications 
  • Terminal posts installed to the string line 
  • Terminal posts installed, height and alignment 
  • The terminal is being put together 
  • Posts are being installed to the height as per manufacturers specifications
  • Setting the string line to the height for posts to be rammed
  • Stringline set on post 
  • Ramming posts in between height posts to the string line 
  • Posts installed to the string line 
  • Getting tools/parts ready for hanging rail while the posts are being rammed 
  • Placing the slider bracket onto the post, ready for the rail to be hung 
  • Hanging the rail (Tandem Lift)
  • Bolting the rail to the posts (Tandem Lift)
  • Lapping the rail correctly in accordance with the traffic direction 
  • Spraying the tops of posts with Cold Gal Spray 
  • Tightening up the centre bolt and placing splice bolts into the w-beam 
  • Placing the splice bolts into the rail to be tightened up snug
  • Installing delineators on the w-beam at 16m spacings
  • Finished barrier installation 
  • Emergency Response
  • Emergency Preparedness
  • Load Restraint
  • Load Restraint Guide 2018 
  • Load Restraint Test (clone)
  • Heavy Vehicle Rear Overhang 
  • Rear Overhang Requirements Test (clone)
  • Induction Assessment
  • Induction Completion
Completion rules
  • All units must be completed
  • Leads to a certificate with a duration: 1 year